Waste Removal Project 1st Phase - Zhongzhuang Adjustment Pool

  • Date:2011-11-10 17:36:00
  • Owner:
  • Scale:$
  • Views:688

The amount of waste containing heavy metal hazardous business waste is estimated to be about 637 cubic meters, weighs about 1,050 metric tons, and the excavation is about 10,928 cubic meters. The general combustible volume is about 327 m ^ 3 and the weight is about 721 metric tons; the general incombustible volume is about 9,776 m ^ 3 and the weight is about 15,642 metric tons; the ash (stone ) volume is about 203 m ^ 3 , The weight is about 361 metric tons.