The site of the project is divided into three districts,
which are located in the north and south sides of the section of the
"Xinguang Bridge" section of the 4th section of Zhongshan Road,
Taiping District, Taichung City, and the eight-purpose site of the south side
of the "Dongping Bridge" on Leye Road. The total area of the site
preparation works is 203,155 square meters. The meter (about 12 hectares), the
total amount of natural volume waste is about 983,145 cubic meters, and the
incineration capacity is about 423,673 metric tons.