Project location:Shuili Township, Nantou County
Contract value:$188,266,216 TWD
Final payment amount:$219,588,415 TWD
Contract duration:723 days
Approved duration:906 days
Commencement date:2016-04-25
Completion date:2018-04-17
Proprietor:The Second Maintenance Office Directorate General of Highways, Ministry of Transportation and Communications
Design:CECI Engineering Consultants, Inc., Taiwan
Construction:Earth Power Construction Co., Ltd.
Main project content:
Longshen Bridge, located at the intersection of
Zhuoshui River and Chenyoulan River, has age of 23 years. After the Hebo
typhoon disaster in 1996, dredging sand and gravel vehicles frequently entered
and exited, bearing long-term heavy-duty crushing, the bridge has been
endangered. After the new bridge is rebuilt, the route will change, and the
length and width of the bridge, bearing capacity and seismic strength will
increase.