The amount of waste containing heavy metal
hazardous business waste is estimated to be about 637 cubic meters, weighs
about 1,050 metric tons, and the excavation is about 10,928 cubic meters. The
general combustible volume is about 327 m ^ 3 and the weight is about 721
metric tons; the general incombustible volume is about 9,776 m ^ 3 and the
weight is about 15,642 metric tons; the ash (stone ) volume is about 203 m ^ 3
, The weight is about 361 metric tons.
ENVIRONMENTAL ENGINEERING
Assessing and improving quality and human rights in mental health and social care facilities.
(World Health Organization)ENVIRONMENTAL ENGINEERING
-
2011
Waste Removal Project 1st Phase - Zhongzhuang Adjustment Pool
-
- Date:2011-11-10 17:36:00
- Owner:
- Scale:$
- Views:1159