When the Liguang Changhua Plant in Taiwan
inspected the groundwater quality by itself in 2002, it found that the
concentration of volatile organic compounds contained in the groundwater was
suspected to exceed the standard, and immediately organized a pollution
improvement project team, and conducted site investigation and remediation
engineering operations. In 2010, in accordance with the "Soil and
Groundwater Pollution Remediation Law", it was announced as a soil and
groundwater pollution control site. The company's environmental team started in
2008, joined the implementation of the pollution site improvement plan,
cooperated with the site's many thorough and systematic investigations, and
carried out remediation projects according to environmental regulations and
patented laws; The removal of the structure, the excavation of the soil with
the verification of the soil, the heavy metal in the local area of the site,
the deep excavation and sub-packaging of the TPH-contaminated soil, and the
low-temperature heat treatment of the VOC-exposed contaminated soil are carried
out to remove the pollution source in order to restore the goal of sustainable
land management.
ENVIRONMENTAL ENGINEERING
Assessing and improving quality and human rights in mental health and social care facilities.
(World Health Organization)ENVIRONMENTAL ENGINEERING
-
2012
Soil Pollution Treatment - AC Area, Taiwan Liguang
-
- Date:2012-10-22 17:24:04
- Owner:
- Scale:$
- Views:1445



