The overall urban landscape and image planning
concept of the 13th phase of Taichung City is to use the public art to create
the “points” of the city, such as the bridges across the streams and the
corners of the street, etc. Nantun River and Turku River (Mayuantou River) are
the “lines” in the city, and the land in each public space is used to create
the “faces” in the city, with the whole of “point”, “line” and “face”. The plan
is to present the city's re-zoning area different from the previous ones, and
combine the trend of the times with the concept of natural ecology,
environmental sustainability, energy conservation and carbon reduction, and
integrate it into the planning and design content to declare the city's land
redemption area, which enters into a new era. East from the east side of Wenxin
South Road and the south side of Mayuantou River, west to the east road of
25M-31 and Yongchun East 2nd Road, south of Mayuantou River, south to Yongshun
Road and Xiangxin South Road, Wenxin Nanqi Road and other road center lines;
the main construction projects are divided into road engineering, gardening
project, rainwater and underwater waterway engineering, sewage sewerage
engineering, public lighting project, common pipeline supply pipe project, and
mound greening project ( Landscape and landscaping), fence works, miscellaneous
projects, and various pre-buried pipeline projects.