Start date:2018/09/28
Completion date:2023/03/02
Employer:China Man-Made Fiber Corporation
Design:Green Field International Group
Supervision:Green Field International Group
Construction:Earth Power Construction Co., Ltd.
Main project Content:
1. Structure: Structural underground RC and above ground SRC
2. Lot size: 2400.62 m2
3. Building area: 1075.79 m2
4. Total floor area: 16898.47 m2
5. Type of Work: A building consists of 4 floors underground and 11 floors above ground
6. Foundation: Continuous raft foundation
This project includes falsework, foundation
work, observation, structural engineering, decoration engineering, door and
window engineering, exterior wall curtain system engineering, miscellaneous
engineering, equipment and elevator engineering, landscape and planting
engineering; distribution equipment engineering of hydropower engineering. ,
generator equipment engineering, power trunk equipment pipeline engineering,
lighting and socket equipment engineering, lightning protection and power
grounding equipment pipeline engineering, weak electrical equipment pipeline
engineering, water supply and drainage sanitary equipment pipeline engineering,
fire equipment pipeline engineering; air conditioning equipment pipeline
engineering.